Brokers and landlords trust Beyond 9 to turn cold-shell space and dated suites into move-in-ready offices on tight schedules — design, permitting, and construction on one schedule.
Send your project details — we'll respond within 1 business day with a feasibility note and licensed-state confirmation.
Thanks for reaching out — we'll be in touch within 1 business day with a feasibility note and licensed-state confirmation.
In the meantime, feel free to call (720) 722-9255.
From a 5,000 SF law-firm refresh to a 60,000 SF tech HQ. Programming, permitting, and construction administration coordinated as a single timeline.
Lease-decision-grade fit tests for tenants and brokers — programming and blocking before signature.
Multi-tenant demising, fire-rated separations, accessibility upgrades, and life-safety coordination.
Stamped, permit-ready CDs coordinated with MEP, structural, and landlord property management.
HVAC, electrical, low-voltage, and plumbing routed for the new program without disrupting building systems.
FF&E specification, procurement support, and sequencing so opening day isn't waiting on chairs.
Weekly site visits, RFI response, and punch through certificate of occupancy.
Design and construction on a single timeline — owner decisions feed into drawings, and field issues feed back the same week.
Site walk, programming, and budget alignment with stakeholders.
Test fits and SD-level drawings with parallel cost validation.
Permit and CD sets coordinated with MEP, structural, and trades.
Jurisdictional submission and code response across 18 states.
Architect of record engaged through CA, punch, and CO.
We had a hard lease commencement and three trades fighting over the same ceiling space. Beyond 9 redrew the routing in two days and we still hit the date.
Senior Director, Workplace Strategy Fortune 500 tenant
From 5,000 SF private-suite fit-outs up through 60,000+ SF full-floor headquarters. We have hundreds of references across the range.
Yes — that's most of what we do. We work backwards from the LCD, sequence permits and finishes around it, and run weekly broker/landlord updates.
Always. Building-standard finishes, fire/life-safety requirements, building-engineer coordination, and dilapidation reports are part of every TI we run.
We document, communicate to the landlord, and redirect the schedule so the tenant isn't stuck waiting on someone else's repair work.
Yes. Demising walls, separate utilities, life-safety zoning, and code-required upgrades — across single, two-tenant, and multi-tenant floors.
Yes — we're also a national interiors contractor. That gives us the construction intelligence that produces tighter drawings and fewer RFIs.
Call us or send your project details — we'll respond within one business day with a feasibility note and licensed-state confirmation.