Municipal recreation centers, YMCAs, aquatic centers, and fieldhouses. Two decades of wet-area, acoustic, and durable-finish expertise.
Send your project details — we'll respond within 1 business day with a feasibility note and licensed-state confirmation.
Thanks for reaching out — we'll be in touch within 1 business day with a feasibility note and licensed-state confirmation.
In the meantime, feel free to call (720) 722-9255.
Municipal, university, and YMCA-grade design — basketball gymnasiums, aquatic centers, group-fitness, locker rooms, and concessions in one coordinated set.
Lap pools, leisure pools, splash pads, and wet-deck detailing — chemistry, dehumidification, and chlorine-resistant assemblies.
Basketball gyms, indoor courts, and field-house volume — lighting, acoustics, and impact-resistant assemblies.
Spin, yoga, weight rooms, and group-fitness suites with sound isolation between adjacent uses.
Wet/dry transitions, vapor barriers, dissimilar-metal isolation, sloped floors, and durable finishes.
Reception, retail, lounge, and lobby spaces designed for high traffic and event flexibility.
ADA, NFPA, IBC, and any municipal/grant-related compliance — documentation produced for survey or audit.
Design and construction on a single timeline — owner decisions feed into drawings, and field issues feed back the same week.
Site walk, programming, and budget alignment with stakeholders.
Test fits and SD-level drawings with parallel cost validation.
Permit and CD sets coordinated with MEP, structural, and trades.
Jurisdictional submission and code response across 18 states.
Architect of record engaged through CA, punch, and CO.
Two prior architects had drawn this aquatic addition. Beyond 9 was the only one who solved the dehumidification and the acoustic to the gymnasium next door.
Director of Parks & Rec Mid-size municipality
Yes — lap pools, leisure pools, splash pads, natatoriums. Pool chemistry, dehumidification, and chlorine-resistant detailing are part of every aquatic project.
Yes — basketball gymnasiums next to group fitness next to aquatics. Acoustic isolation between adjacent uses is one of our deeper specialties.
Yes. We've delivered municipal rec centers, county facilities, YMCA / YWCA buildouts, and university campus recreation across multiple states.
Vapor barriers, dissimilar-metal isolation, slope-to-drain, sealed grout, and antimicrobial finishes — designed so things don't fail in year three.
Yes. Documentation is produced to support audit and grant-compliance reviews. Tell us your funding source on the form.
Programming 6-10 weeks, design 4-9 months depending on scope, permitting and construction follow. We give realistic timelines after the discovery call.
Call us or send your project details — we'll respond within one business day with a feasibility note and licensed-state confirmation.