Boutique studios, gyms, and wellness facilities. Sprung floors, sound isolation, locker rooms, and hot-room HVAC — finishes that survive teenagers, tradeshow setups, and chlorine.
Send your project details — we'll respond within 1 business day with a feasibility note and licensed-state confirmation.
Thanks for reaching out — we'll be in touch within 1 business day with a feasibility note and licensed-state confirmation.
In the meantime, feel free to call (720) 722-9255.
From a 2,500 SF spin studio to a 30,000 SF wellness center — programming, finishes, and MEP for fitness-specific use.
Spin, yoga, HIIT, pilates, and barre — sprung floors, mirrors, sound iso, and the right HVAC for hot-room or cold-plunge.
Impact-resistant flooring, equipment-load engineering, and noise-floor planning for cardio-to-spin adjacency.
Wet-area vapor barriers, dissimilar-metal isolation, slope-to-drain, and finish specs that survive year three.
STC-rated partitions, isolated framing, and ceiling assemblies so a spin class doesn't bleed into yoga next door.
Hot-room ventilation, recovery-room dehumidification, and air-quality strategies for high-occupancy classes.
Anti-microbial paint, urethane-coated concrete, sealed grout, and equipment specification.
Design and construction on a single timeline — owner decisions feed into drawings, and field issues feed back the same week.
Site walk, programming, and budget alignment with stakeholders.
Test fits and SD-level drawings with parallel cost validation.
Permit and CD sets coordinated with MEP, structural, and trades.
Jurisdictional submission and code response across 18 states.
Architect of record engaged through CA, punch, and CO.
We had a hot-yoga studio next door to a board room and a spin class above. Beyond 9 designed the assemblies — none of those spaces hear each other.
Owner-Operator Mid-size boutique fitness chain
Yes — for dance, yoga, pilates, and hot studios. Specifications match the program and equipment loads.
STC-rated partitions, isolated framing, and ceiling assemblies tuned to the adjacency. Spin/yoga/strength side-by-side is solvable with the right details.
Dedicated ventilation, recovery, and dehumidification systems for hot yoga and infrared. We've designed these across multiple chains.
Yes — wet-area vapor barriers, slope-to-drain, dissimilar-metal isolation, and antimicrobial finishes that survive long term.
Yes. Structural backing for climbing walls, rig points, and specialty cardio with equipment-vendor coordination.
Permit drawings 4-6 weeks, permitting 4-8 weeks, construction 12-20 weeks depending on amenities and locker rooms.
Call us or send your project details — we'll respond within one business day with a feasibility note and licensed-state confirmation.